Do I-RECs really work? The answer depends on what a company expects them to do. They track renewable electricity attributes and may support market-based Scope 2 reporting when the relevant criteria are met. They do not change the electricity physically delivered to a site, and a purchase alone does not prove that a new renewable energy project was built because of that buyer.

Understanding these distinctions helps companies choose procurement that fits their goals and make claims that match the available evidence.

What Is an I-REC?

An I-REC for Electricity, written I-REC(E), is an exchangeable Energy Attribute Certificate that tracks information about renewable electricity generation. One certificate represents 1 MWh of renewable electricity, with details such as its generating facility and energy source recorded through the tracking system.

I-RECs can be issued, transferred, and redeemed through the registry. Once a certificate is redeemed for a buyer, it cannot be transferred again, and the redemption statement provides a record of the transaction and the associated claim.

Do I-RECs Change the Electricity at a Site?

No. Electricity from different generators flows through interconnected grids, so a certificate does not route specific renewable electricity directly to a company’s building. It transfers the environmental attributes associated with eligible generation through a tracking system.

That distinction explains what an I-REC can document: the renewable attributes assigned to the buyer. It does not show that the physical electricity supply at the site changed at the moment of purchase.

Do I-RECs Cause New Renewable Projects?

A certificate purchase can contribute to demand for renewable electricity attributes, and certificate sales may provide revenue to generators. The value of that revenue and its role in a project’s finances can vary by market and project.

A purchase alone does not show that a specific renewable project depended on the buyer’s decision, or that the transaction caused new capacity to be built. Under the GHG Protocol’s Scope 2 accounting framework, certificates support the allocation of electricity emissions in an inventory. That accounting result does not, by itself, measure the wider impact of the purchase.

Companies seeking to support new capacity can set additional procurement criteria, such as project location, operating date, or contract duration, where suitable options are available. Any claim about a project’s impact needs evidence tied to that claim.

Can I-RECs Support Scope 2 Reporting?

Yes. Under the GHG Protocol Scope 2 Guidance, I-RECs may be used as contractual instruments in the market-based method when they meet the applicable Scope 2 Quality Criteria. These criteria address issues such as whether the attributes are uniquely claimed, properly tracked, and relevant to the electricity use being reported.

The location-based method uses average emissions data for the grid where electricity is consumed. Where market-based reporting applies, companies report both location-based and market-based results. The figures can differ because each method answers a different accounting question.

See the GHG Protocol Scope 2 Guidance for details about contractual instruments and reporting criteria.

What Should Buyers Check Before Making a Claim?

Before purchasing I-RECs, companies should check that the certificates fit their sites, reporting period, and intended claim. Requirements and availability can vary by market, so buyers should review the relevant reporting framework and local rules.

  • Confirm the certificate’s country, generation period, and volume.
  • Check that the certificates can be used for the intended market-based Scope 2 claim.
  • Confirm that the certificates are redeemed for the intended buyer and retain the redemption statement.
  • Keep the accounting claim separate from claims about physical electricity supply or new project impact.

How Can CnerG Support I-REC Procurement?

For companies considering I-RECs, CnerG can help assess available options by market and coordinate sourcing and redemption documentation. The right fit depends on where a company operates, which reporting requirements it follows, and what outcome it wants its procurement to support.

Explore I-REC procurement through CnerG.

Summary

  1. What Is an I-REC?

  2. Do I-RECs Cause New Renewable Projects?

  3. Can I-RECs Support Scope 2 Reporting?

  4. What Should Buyers Check Before Making a Claim?

  5. How Can CnerG Support I-REC Procurement?

Fique por dentro dos mercados de renováveis e carbono

Cadastre-se para receber sinais de preços, atividade dos compradores e insights de mercado.

Ao enviar este formulário, você concorda com a política de privacidade da CnerG e em receber comunicações de marketing da CnerG.

Market Insights

Fique por dentro dos mercados de renováveis e carbono

Cadastre-se para receber sinais de preços, atividade dos compradores e insights de mercado.

Ao enviar este formulário, você concorda com a política de privacidade da CnerG e em receber comunicações de marketing da CnerG.

Related Content

logo image whitelogo text white

Assuma o controle das suas emissões hoje mesmo!

Assuma o controle das suas emissões e da sua estratégia de sustentabilidade

Solicitar demo
CnerG Co., Ltd.
(Korea)
|
CnerG Pte. Ltd.
(Singapore)
|
CnerG Inc.
(USA)
© Copyright 2026, All Rights Reserved by CnerG