TCO Certified Generation 11: Proposed REC Requirements
Market Insights | Sep/16/2026
In June 2026, TCO Development published Draft 2 of TCO Certified Generation 11 for public consultation. The draft proposes increasing the renewable electricity share from 15% to 30% and extending the criterion to factories manufacturing display panels larger than 10 inches.
For electronics brands and suppliers, the proposed changes put more focus on factory-level electricity data and REC cancellation evidence. Generation 11 remains a draft, so these details could change before the final criteria are published.
What Changes Does Draft 2 Propose?
Generation 10 requires a 15% renewable electricity share at final assembly factories. Draft 2 proposes 30% for final assembly factories and adds factories that manufacture display panels larger than 10 inches. Each covered factory would need to be assessed separately.
| Topic | Generation 10 | Generation 11 Draft 2 |
|---|---|---|
| Renewable electricity share | 15% | Proposed 30% |
| Factories covered | Final assembly factories | Final assembly and display-panel factories producing panels larger than 10 inches |
| REC evidence | Ownership and retirement evidence | REC cancellation statements and electricity-consumption data using the same reporting boundary |
| Factory averaging | Not permitted | Not permitted |
For a factory using 10,000 MWh of electricity in a reporting year, a 15% share would equal 1,500 MWh. The proposed 30% share would equal 3,000 MWh, based on the factory’s eligible renewable electricity and total consumption.
How Must REC Evidence Match the Claim?
Draft 2 places greater emphasis on REC cancellation statements and the reporting boundary they support. A factory-level claim needs a cancellation statement that identifies the relevant beneficiary and supports the same boundary used for the factory’s electricity-consumption data.
A broad company or regional cancellation statement does not automatically support a narrower factory claim. The draft also calls for independently verifiable evidence of the full electricity consumption within the stated boundary and reporting period.
This makes the connection between certificates and factory data central to the calculation. REC volume, beneficiary details, electricity records, and the claim’s reporting boundary need to refer to the same reporting entity.
Which REC Systems Are Accepted?
Draft 2 lists accepted REC systems by country. For example, it lists I-REC and TIGR for Vietnam, Malaysia, Singapore, and Thailand. A certificate’s eligibility therefore depends on the factory’s market and the system recognized for that country.
Unbundled RECs remain an option in the draft. A company does not have to procure electricity through a bundled renewable electricity contract, but it does need valid REC cancellation evidence from an accepted system and documentation that supports the relevant factory claim.
Companies should check TCO Development’s Generation 11 draft page for the relevant product category and country-specific REC list before planning procurement.
When Could Cross-Border RECs Be Used?
Draft 2 keeps an exception for markets where accepted REC prices exceed specified thresholds. If the price of all accepted RECs in the relevant market is above USD 10/MWh, up to 30% of the renewable electricity purchased may be covered by RECs from neighbouring markets.
If the price is above USD 30/MWh, the draft allows up to 70% of the renewable electricity purchased to be covered by neighbouring-market RECs. Use of this exception requires documented market-price evidence and verification.
This is a defined exception, not general permission to source RECs across borders. For factories in Taiwan, Draft 2 names China, Japan, the Philippines, South Korea, and Vietnam as possible neighbouring markets under the exception.
Can a Brand Report Its Share of Production?
Draft 2 allows a brand owner to report its share of production at a factory. The share can be calculated by production volume or revenue, and the selected method must be applied consistently for that factory and reporting period.
When a brand reports its production share, it needs evidence for both the factory’s total production or revenue and the portion linked to that brand. The cancellation statement and electricity-use data must support the same reporting boundary used in the calculation.
What Should Companies Prepare?
Electronics brands and suppliers can start by mapping the factories that may be covered and checking the draft’s requirements for each relevant product category. Because the proposal is factory-based, companies should keep separate electricity and REC records for each covered factory.
- Model the proposed 30% share for final assembly and applicable display-panel factories.
- Check the accepted REC system for each factory’s country before procurement.
- Match REC cancellations and electricity-consumption evidence to the same reporting boundary and period.
- Keep independently verifiable records for full factory electricity consumption.
- Review each factory separately because Draft 2 does not allow averaging the renewable electricity share across factories.
TCO Development planned to publish the final Generation 11 criteria in December 2026, with the new generation planned to launch in December 2027. Until the final criteria are available, companies should treat the 30% share and related documentation details as proposals.
How Can CnerG Support REC Procurement?
CnerG can help electronics brands and suppliers assess REC options in relevant markets and coordinate sourcing and cancellation documentation. The appropriate system and reporting boundary depend on the factory’s location and the final TCO Certified criteria.
Explore renewable energy certificate procurement through CnerG.
Summary
What Changes Does Draft 2 Propose?
How Must REC Evidence Match the Claim?
Which REC Systems Are Accepted?
When Could Cross-Border RECs Be Used?
Can a Brand Report Its Share of Production?
What Should Companies Prepare?
How Can CnerG Support REC Procurement?
Related Content
Assuma o controle das suas emissões hoje mesmo!
Assuma o controle das suas emissões e da sua estratégia de sustentabilidade